Nabard Logo Top Navigation Image
About NABARD I Role and Functions I Subsidiaries
I Associates
I CIRCULARS I Model Bankable Projects I Chairman's Speeches
Index ContactDatabank
 
National Bank for Agriculture and Rural Development
 Genesis of RIDF  
 RIDF at a Glance  
 Sanctions and  Disbursements  

INNOVATIVE PROJECTS

 
 Success Stories  
 Monitoring Mechanism  
 Evaluation studies  
 RIDF - Photo Gallery  
 RIDF XVIII Policy CIrcular  
 State-Wise List Of Projects Sanctioned Under RIDF-XVIII  
 StatewiseList of ongoing Projects  
 State-wise List of Completed Projects  
 Rural Infrastructure Promotion Fund  
   

Rural Infrastructure Development Fund

   
   
 

Model & Innovative Projects

 
 
1) Lining of Kuhls
2) Augasi pump canal
3) Rural Electrification
4) Joint Forest Management
5) One Lakh Tubewell Project
6) Gokul Gram Yojana
7) Construction of Minors
8) Primary schools under Saraswati Bal Vidya Sankalap Yojana
9) Soil and Water Conservation on Watershed approach
10) Rubber project
11) Rural Drinking Water Supply
12) Rainwater Harvesting Structures
13) Shankarpur Fishing Harbour
 
 
HARYANA
 
Project : Construction of minors in Major Irrigation Project (MJP)
 
Introduction
 

In all irrigation schemes management of available water below the outlet is of vital importance and has long been neglected. Equitable distribution of water to the fields and adoption of proper water application methods have great bearing on the benefits by way of returns per unit of water delivered to each hectare of land irrigated. The overall success of an irrigation project hinges around the management of water beyond the outlet point. Potential utilised lags behind potential created by a wide margin with large scale water development, major areas needing attention include excessive loss of water due to seepage, inequitable distribution of water between head and tail reaches, poor maintenance of canal system and lack of field channels.

Concept

In the scenario of shortage of irrigation water in the state compared to the demand, the idea is to extend the existing water resources to larger areas by means of appropriate water management.

Objectives

To increase coverage of irrigation by extending the length of minors / distributaries of Major Irrigation Systems of the State at the existing water
allowance.

Project Components

Construction of minors and distributaries and associated work of Head works, lining of minors, outlets etc.

Major Features

Timely availability of irrigation water. Containing water related disputes in villages.

Uniqueness

Wherever WUAs have been formed below the minor outlets there is equitable distribution of irrigation water (Warabandi) and there is no dispute.

Areas of Concern

Budgetary provision for Operation and Maintenance of minors / distributaries was quite inadequate. Recovery of water rates from beneficiaries was not enough to meet full operation and maintenance expenditure of the State Government.

Suggestions

Farmers need to be encouraged or organised to undertake Karseva for maintenance of minors. Formation of Water User's Associations has to be ensured as the relevant act has been enacted in the state.

 

 

 

 

 
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
National Bank for Agriculture and Rural Development
 
 
   
  Technical Services Department
This division is the service provider on technical issues
 
© NABARD 2007 Privacy Policy | Disclaimer | Feedback | Contact us | Sitemap
Site designed & developed by : Lintas Personal (SRS), 2007
Site maintained by : Web Werks India Pvt Ltd.