Page 29 - GIZ CAFRI Report
P. 29

Project Approach


           In the project, threat assessments of Papum   Remedial measures to address problems based on the ground
           Poma river from climate change has been      realities, including a wide range of activities like aorestation,
           carried out. e dried up springs/lakes in    agriculture, horticulture, catchment area treatment, livelihood, soil
           the catchment area that feed run-o waters   and water conservation measures, trenching, check dams, and
           to the river have been revived.              stabilization of river banks etc. have been carried out.




           Outputs/Outcomes



                                    A total of             36,711 Nos.         560 nos.
           Climate change           15,206 nos.            of recharge pits,   of brush wood check
           adaptation activities    of contour staggered                       dams
           like development of      trenches
           contour trenching,
           bench trenching, check   1505 nos.             6986 nos.            399 nos.        196 nos.
           dams, anicuts, etc.                                                                 of gabion check
           carried out in           of contour            of diversion surface   of brush wood   dam and 14 nos
                                    continuous trenches
                                                                               check dams
                                                          drain
           28 number                                                                           of water
                                                                                               harvesting
           of Gram Panchayats                                                                  Ponds have
                                                                                               been completed.
                                                                                               280 number of
                                                                                               Water
                                                                                               Harvesting
                                                                                               Structures have
                                                                                               been built
















           Village Water Security Plan
           prepared for the
           28 number
           of Gram Panchayats and a
           cadre of para-hydrogeologists
           created for the same





                                                                            Interventions for conserving and
                                                                            recharging of Springs for addressing
                                                                            Climate Change vulnerabilities of
                                                                            Papum-Poma River






                                                                                                            29
                                                                                          Climate Change Interventions of
                                                                                               NABARD – A Glimpse
   24   25   26   27   28   29   30   31   32   33   34